Installation of loft insulation in all available roof space in First, Second and Third Courts

In August 2012 the College upgraded its loft insulation in the First, Second and Third Court roof space. These buildings should now require less heat input to keep these buildings at a comfortable ambient temperature, and therefore less gas is used by the boilers that supply hot water to radiators. An estimate of the gas savings is not possible at this time, with the current metering infrastructure, but an update will be given on this site in due course.